top of page


Engineering Beyond the Standard: Redesigning an Inclined Shaft Trolley System at Snowy Hydro
The Snowy Rive Hydro Scheme has become a part of Australian engineering folklore. 70 years later and the work continues. Image courtesy of the National Archives of Australia. In heavy industry and infrastructure, not every engineering problem fits neatly within a single Australian Standard. Some projects sit in the grey space between multiple codes, requiring application of engineering judgement, experience, and defensible design thinking over finding a fit-for-purpose out
richard-norris0
Jan 243 min read
Â
Â
Â
bottom of page
